Improve a Display Energy Certificate rating before renewal
A DEC reflects measured energy use. Better records and better operation give the next assessment a more useful story.

Start with the previous DEC and recommendation report
A Display Energy Certificate gives a qualifying public building an operational rating based on measured energy. Before renewal, retrieve the current DEC, its technical information and the associated recommendation report. Mark which operational or physical measures were completed, which remain planned and which no longer suit the building. The government methodology for Display Energy Certificates expects the assessor to consider existing recommendations and the occupier's response.
Build a reliable 365-day energy record
Track electricity, gas, district energy and other relevant fuels with meter identifiers, reading dates and supporting bills. Investigate gaps, estimates, overlaps and meter replacements while the information is still recent. A DEC operational rating normally considers a 365-day assessment period aligned with the main heating fuel. If one meter supplies several buildings, map the arrangement and discuss it with the accredited DEC assessor rather than inventing a split. Consistent records improve the assessment and also help facilities teams find unusual consumption.
Explain occupancy and exceptional uses with evidence
Opening hours, attendance and building use can affect how the operational rating is understood and, where the methodology permits, adjusted. Retain published opening hours or robust attendance records. Separately metered energy uses can be treated separately only when they meet the methodology's evidence rules; they are not a convenient way to remove inconvenient consumption. Record changes of use, floor area, occupier, plant and operating hours so the assessor can decide what is relevant.
Turn renewal preparation into an operating routine
Review heating and cooling schedules, controls, lighting hours, maintenance issues and overnight base load throughout the year. Use the recommendation report to prioritise investigation, then keep evidence of action and results. A better DEC rating should follow genuine, documented energy management rather than a last-minute data exercise. For a Display Energy Certificate assessment in London, send the building details, current DEC and advisory report, meter records and occupancy evidence. Our DEC energy-data checklist sets out the core information, and the DEC versus EPC guide for public buildings explains why the operational and asset ratings answer different questions.