What to send when asking for an SBEM quote
A useful model begins with a brief that says what is known and what is still changing.

Define the output first
Tell us whether the calculation is for a design-stage review, as-built submission, non-domestic EPC or a combination. The jurisdiction and building-control route matter. Approved Document L is a starting point for England.
Send current drawings
Plans, sections and elevations help define the geometry, zones and use. Mark drafts clearly. The approximate floor area and any mixed-use spaces are valuable even when drawings are incomplete.
Describe the energy systems
Fabric, glazing, heating, cooling, ventilation, hot water, lighting and controls influence the model. Separate specified products from provisional assumptions.
Make the scope of the SBEM calculation explicit
For a commercial building, say whether the SBEM calculation covers the entire property, a new extension or a defined part of a larger project. Include the intended use of each area and any unusual operating pattern. A design-stage SBEM model can test proposed specifications, while the as-built calculation needs the final installed details. Naming the stage early helps avoid pricing the wrong output.
Flag what is still provisional
Send drawing revision numbers and a short list of unresolved choices, such as glazing, plant or lighting controls. Where a non-domestic EPC is also required, mention it separately: an SBEM compliance result is not automatically the certificate for marketing or occupation. This distinction makes the energy-modelling quote and delivery schedule clearer.
Our SBEM page explains the service. The fastest first message gives the address, use, project stage, current drawings, requested output and decision date.
