02036673353info@londonpropertyreports.co.uk
COMMERCIAL EPC

Commercial EPC after an office or shop fit-out: what changed?

A completed fit-out can change the services behind a non-domestic EPC. Record the final specification before the transaction starts.

Fitted London office with lighting ventilation and heating controls for a commercial EPC

Start with the transaction and the assessment boundary

A commercial fit-out does not automatically create the same EPC requirement in every situation. A non-domestic Energy Performance Certificate is generally connected to construction, sale or letting, and the correct assessment may cover a whole building or a separately used unit. The government guide to non-domestic EPCs explains the triggers and building-unit approach. Before commissioning a commercial EPC after a fit-out, state what is being marketed and compare it with the boundary on any existing certificate.

Record the final building services

Heating, cooling, mechanical ventilation, lighting and controls affect a commercial energy assessment. Keep final equipment schedules, commissioning information and marked-up plans showing what was installed. Distinguish landlord systems from tenant equipment and identify any shared plant serving the unit. If a shell was assessed on an assumed fit-out, tell the commercial energy assessor what is now present. A polished interior photograph does not replace the technical specification behind the non-domestic EPC calculation.

Reconcile drawings with the premises

Fit-outs often move partitions, alter activity zones or change operating patterns. Provide an accurate floor plan, approximate area and current use for each part. Note retained glazing, fabric changes and controlled areas. The assessor will decide what information can be used and whether a site inspection or further evidence is needed. A commercial EPC comments on energy performance; it does not certify the safety, maintenance condition or fitness for purpose of the building services.

Prepare one clean handover pack

Combine the lease or sale boundary, as-fitted plan, service schedules, controls information, previous EPC and access arrangements. This gives the assessor a traceable brief and helps the property team avoid searching through contractor emails. Use our Commercial EPC Certificate service for London premises when a current assessment is required. For lease-stage checks, read our commercial EPC guide for London landlords; for multi-unit buildings, the shop, office or whole-building EPC guide explains how the boundary changes the instruction.

PUT THE GUIDE INTO PRACTICE

Choose your next step

Read the service details or start with your property information.